skip navigation

Campus Network Upgrade Project Building Status Table

CITES > project status > campus network upgrade > building status > detailed building status table

Last modified August 15, 2007

2005 Campus Network Upgrade Building Status
  Building Drawings Issued Drawings Returned CER Space Identified CER Space Approved CER Construction Started CITES Plant Engineering Started CITES Plant Engineering Completed Drawings to F&S Electronics Order to Purchasing Electronics Received Construction Start Construction Complete
ACES
  Turner Hall 08/31/04 10/31/04 12/01/04 12/22/04 04/22/05 11/01/04 12/05/04 03/17/05 05/04/05 05/23/05 04/22/05 11/28/05
  ERML (Electronics Upgrade) N/R N/R N/R N/R N/R N/R N/R N/R 05/10/05 06/20/05 N/R 10/28/05
AHS
  Louise Freer Hall 12/01/04 12/16/04 01/07/05 04/28/05 08/11/05 01/03/05 05/23/05 05/24/05 09/06/05 11/18/05 07/05/05 03/31/06
  Speech & Hearing Clinic 04/04/05 05/20/05 04/11/05 04/18/05 07/26/05 04/18/05 07/08/05 07/20/05 08/26/05 09/21/05 07/05/05 06/12/06
  Rehabilitation Clinic 03/28/05 06/27/05 06/27/05 06/27/05 10/20/05 07/01/05 10/03/05 10/04/05 11/11/05 11/22/05 10/20/05 05/02/06
Business
  David Kinley Hall 11/30/04 02/24/05 12/06/04 02/04/05 08/08/05 04/18/05 06/03/05 06/07/05 11/11/05 11/22/05 07/05/05 05/02/06
Communications
  Gregory Hall 03/11/05 05/03/05 08/12/05 01/10/06 05/01/06 07/11/05 03/31/06 04/07/06 08/31/06 09/21/06 05/01/06 01/16/07
Education
  Children's Research 12/20/04 01/21/05 01/07/05 01/27/05 08/08/05 01/04/05 04/08/05 04/11/05 10/14/05 11/18/05 06/22/05 01/17/06
Engineering (Selected Building Electronics Upgrade)
  Everitt Lab N/R N/R N/R N/R N/R N/R N/R Note 5 01/10/05 03/09/05 03/11/05 03/18/05
  Talbot Lab N/R N/R N/R N/R N/R N/R N/R Note 5 05/23/05 07/15/05 07/19/05 08/11/05
  Newmark Lab N/R N/R N/R N/R N/R N/R N/R N/R 05/27/05 06/16/05 N/A 08/18/05
  Mechanical Engineering Building N/R N/R N/R N/R N/R N/R N/R Note 5 05/17/05 06/02/05 07/17/05 07/17/05
  Material Science & Engineering Building N/R N/R N/R N/R N/R N/R N/R Note 5 05/23/05 06/09/05 07/07/05 07/07/05
FAA
  Music Building 07/13/05 09/01/05 07/29/05 09/14/05 04/03/06 10/12/05 01/06/06 02/01/06 11/29/06 12/11/06 03/08/06 03/23/07
  Architecture 11/22/04 01/25/05 N/A N/A N/R 02/11/05 08/31/05 09/01/05 12/15/05 01/05/06 10/17/05 06/14/06
Graduate College (Electronics Upgrade)
  Coble Hall N/R N/R N/R N/R N/R N/R N/R N/A 05/04/05 05/20/05 N/R 10/12/05
GSLIS
  GSLIS 06/01/04 07/01/04 N/R N/R N/A 07/01/04 07/15/04 09/03/04 12/21/04 02/17/05 10/20/04 01/10/05
ILIR
  ILIR 01/06/05 01/13/05 12/20/04 12/20/04 03/22/05 01/14/05 02/15/05 02/24/05 04/11/05 05/05/05 03/22/05 07/11/05
LAS
  Davenport Hall 11/17/04 12/22/04 11/18/04 12/01/04 06/01/05 01/04/05 04/07/05 04/11/05 05/19/05 06/27/05 05/23/05 01/13/06
  Foreign Language 04/14/05 05/17/05 07/27/05 09/02/05 02/13/06 07/11/05 01/20/06 01/23/06 02/22/07 04/27/07 02/21/06 07/20/07
  Atmospheric Sciences 11/30/04 05/18/05 04/15/05 05/31/05 08/15/05 04/16/05 06/28/05 07/07/05 08/13/05 10/10/05 08/15/05 01/13/06
  Altgeld Hall 08/31/04 11/07/04 11/19/04 03/01/05 01/11/06 06/06/05 10/06/05 10/07/05 06/15/06 07/18/06 11/10/05 08/11/06
  Burrill (BDSW Electronics Upgrade) N/R N/R N/R N/R N/R N/R N/R N/R 05/10/05 06/20/05 N/R 11/29/05
  Morrill (BDSW Electronics Upgrade) N/R N/R N/R N/R N/R N/R N/R N/R 05/10/05 06/20/05 N/R 11/30/05
  CLSL SOLS (BDSW Electronics Upgrade) N/R N/R N/R N/R N/R N/R N/R N/R 04/28/05 01/05/06 N/R 09/20/06
Law
  Law Building 11/29/04 03/14/05 04/21/05 06/03/05 02/03/06 03/16/05 08/31/05 09/01/05 05/17/06 06/19/06 02/03/06 10/04/06
Library
  Main Library N/A 12/22/04 11/24/05 03/02/05 04/10/06 12/15/04 05/19/05 See supplemental table, Find No. 1 09/22/06 10/06/06 04/04/06 05/04/07
Social Work (Electronics Upgrade & Selected Infrastructure)
  Social Work (1207 Oregon) N/R N/R N/R N/R N/R 04/19/05 04/29/05 05/03/05 05/09/05 06/03/05 08/08/05 08/19/05
  Social Work (1203 Oregon) N/R N/R N/R N/R N/R N/R N/R N/A 05/09/05 05/26/05 N/A 06/28/05
  Social Work (608 S Matthews) N/R N/R N/R N/R N/R N/R N/R N/A 05/09/05 05/26/05 N/A 06/28/05
Vet Med
  Vet Med Basic Sciences 11/01/04 03/06/06 N/R N/R N/R 06/15/06 09/25/06 09/27/06 02/21/07 03/30/07 10/23/06 07/20/07
  Vet Med Small Animal Clinic 03/07/05 05/20/05 N/R N/R 12/19/05 06/20/05 10/10/05 10/12/05 04/20/06 05/30/06 12/12/05 09/20/06
  Vet Med Large Animal Clinic (Wireless) N/R N/R N/R N/R N/R 03/07/06 03/13/06 03/28/06 04/20/06 05/30/06 04/03/06 09/20/06
2006 Campus Network Upgrade Building Status
  Building Drawings Issued Drawings Returned CER Space Identified CER Space Approved CER Construction Started CITES Plant Engineering Started CITES Plant Engineering Completed Drawings to F&S Electronics Order to Purchasing Electronics Received Construction Start Construction Complete
ACES
  Animal Science Laboratory 09/12/05 11/04/05 10/19/05 10/20/05 08/30/06 11/04/05 03/14/06 03/16/06 11/21/06 11/28/06 08/21/06 04/20/07
  Meat Sciences Laboratory 09/12/05 10/19/05 09/13/05 10/20/05 01/25/06 10/14/05 12/02/05 12/05/05 02/24/06 03/03/06 01/11/06 05/19/06
  Agricultural Engineering Sciences 10/18/05 02/23/06 04/13/06 06/28/06   02/28/06 09/11/06 09/20/06 06/27/07 07/30/07 12/23/06  
AHS
  Huff (Electronics) N/R N/R N/R N/R N/R 07/21/06 08/08/06 10/17/06 02/23/07 03/29/07 01/03/07 07/05/07
Aviation (Electronics/Partial Upgrades)
  Willard Building #668                 07/21/05 09/12/05   11/10/05
  Willard Building #669                 07/21/05 09/12/05    
  Willard Building #677                 07/21/05 09/12/05    
Business
  Surveying Building 09/10/05 12/12/05 02/09/06 02/19/06 08/14/06 01/09/06 01/20/06 03/13/06 11/29/06 12/15/06 08/14/06 04/20/07
Chancellor
  Willard New Terminal 03/17/06                      
Communications (Electronics Upgrades)
  Campbell Hall N/R N/R N/R N/R N/R N/R N/R Note 5 09/16/05 10/11/05 11/16/05 11/30/05
Education (CER & Electronics Upgrade)
  Education Building N/A 03/20/06 N/A N/A N/A 04/19/06 08/11/06 11/02/06 07/18/07   07/09/07  
Engineering (Selected Building Electronics Upgrade)
  Engineering Sciences Building N/R N/R N/R N/R N/R 05/15/06 06/12/06 06/14/06 03/27/06 09/01/06 10/30/06 05/19/07
  Loomis Lab N/R N/R N/R N/R N/R N/R N/R 03/02/06 04/25/06 05/18/06 04/17/06 08/11/06
  Coordinated Science Lab N/R N/R N/R N/R N/R N/R N/R          
  Material Research Lab N/R N/R N/R N/R N/R N/R N/R 03/02/06 03/28/06 05/18/06 03/08/06 07/24/07
  Hydrosystems Engineering N/R N/R N/R N/R N/R 10/18/06 11/15/06 11/20/06 02/21/07 03/06/07 03/22/07  
FAA
  Krannert Art Museum 01/09/06 12/19/06 12/19/06     05/18/06            
  Art & Design Building 09/27/05 12/21/05 11/09/05 12/15/05 11/06/06 01/09/06 06/21/06 09/05/06 05/09/07 05/30/07 11/06/2006 08/17/07
LAS
  English Building 08/10/05 09/26/05 01/26/06 03/16/06 11/13/06 12/19/05 04/03/06 04/25/06 03/01/07 06/26/07 10/05/06  
  Noyes Lab (Electronics) N/R N/R N/R N/R N/R N/R N/R   06/28/06      
  Illini Hall 09/07/05 11/22/05 03/01/06 04/19/06 09/11/06 01/04/06 05/04/06 05/11/06 12/22/06 02/07/07 08/21/06 03/30/07
  Natural History Building     07/21/06 08/13/07     07/10/07          
  Astronomy N/A N/A N/A N/A N/A 04/04/06 04/07/06 04/05/06 04/13/06 05/30/06 04/03/06 06/12/06
Medical Science
  Medical Sciences Building 12/14/06 05/25/07 N/R N/R 05/30/07 07/01/07            
  Burrill Annex                        
Provost
  Armory 07/24/06 08/18/06 N/A N/A 06/01/07 07/21/06 02/02/07 02/19/07     04/17/07  
  University High School 09/27/05 03/06/06 10/21/05 03/06/06 06/05/06 01/06/06 04/17/06 04/18/06 08/09/06 09/08/06 06/05/06 10/04/06
  Foellinger Auditorium 02/03/06 02/07/06 03/03/06 02/07/06 08/14/06 02/10/06 05/18/06 05/23/06 11/06/06 12/15/06 08/02/06 01/11/07
Vice Chancellor Public Engagement
  Levis Faculty Center                        
Vice Chancellor Student Affairs
  Illini Union 11/18/05 03/15/07 03/31/06 04/07/06 07/26/07 02/27/06 06/23/07 07/30/07        
  1101 W. St. Mary's Road 01/20/06 02/02/06 02/02/06 03/08/06 01/08/07 02/02/06 04/07/06 10/06/06 07/06/06 07/21/06 01/08/07 02/09/07
  Student Services (Electronics) N/R N/R 11/08/06 11/13/06 07/24/07 11/20/06 01/09/07 03/12/07     08/04/07  
  Assembly Hall (Electronics) N/R N/R N/R N/R N/R N/R N/R Note 5 01/09/06 01/18/06 02/20/06 03/30/06
  Ice Arena 01/20/06 03/22/06 03/28/06 04/29/06 09/30/06 03/28/06 06/26/06 07/10/06 08/31/06 09/13/06 09/25/06 01/02/07
Vice Chancellor Research
  Technology Commericalization 10/17/05 10/19/05 10/14/05 11/01/05 01/25/06 10/17/05 11/04/05 11/04/05 12/08/05 01/06/06 12/22/05 05/02/06
  Center for Advanced Study (Electronics) 02/03/06 02/07/06 N/R N/R N/R N/A N/A N/A 05/19/06 06/19/06 N/A 08/11/06
Veternary Medicine
  Surgical & Obstetrics Lab 02/06/06                      
2007 Campus Network Upgrade Building Status
  Building Drawings Issued Drawings Returned CER Space Identified CER Space Approved CER Construction Started CITES Plant Engineering Started CITES Plant Engineering Completed Drawings to F&S Electronics Order to Purchasing Electronics Received Construction Start Construction Complete
ACES
  Child Development Laboratory 07/11/06 11/10/06 12/06/06 12/06/06 06/04/07 11/01/06 03/12/07 03/20/07 05/02/07 05/29/07 06/04/07  
  Taft House 02/01/07 03/12/07 02/01/07 03/12/07   03/15/07 05/10/07 05/18/07 06/07/06      
  Plant Sciences Laboratory 04/10/06 07/11/06 03/02/06 04/04/06 07/09/07 04/06/06 09/25/06 10/20/06 07/18/07 08/14/07 07/09/07  
  Milking Parlor 02/01/07 02/02/07 N/A N/A N/A 03/12/07 06/04/07 06/12/07        
  Burnsides Research Laboratory 08/28/06   08/28/06 04/13/07   02/07/07 03/03/07 03/07/07        
  Agricultural BioProcess Laboratory 08/29/06 10/13/06 08/29/06 10/12/06   10/12/06 02/22/07 03/07/07        
AHS
  Motorcycle Safety Office (electronics) N/R N/R N/R N/R N/R N/R N/R N/R        
Aviation (Electronics Upgrades)
  Willard Quonset Hut #5 - Aviation Human Factors                        
  Willard AMT - Aviation Human Factors                        
  Police Training Institute Firing Range                        
Business
  Wohlers Hall (electronics) N/R N/R N/A N/A   05/31/07 06/01/07 07/26/07     08/11/07  
Chancellor/F&S
  Plant Services Building NE                        
  Mailing Center                        
  Physical Plant Services Building                        
Education
  Colonel Wolfe School 10/17/06 03/12/07 06/05/07 06/25/07   06/06/07 06/20/07 06/27/07        
Engineering
  Nuclear Physics Laboratory                        
  Ceramics (electronics/wireless) N/R N/R N/R N/R N/R 11/27/06 12/14/06 12/18/06 02/01/07   08/13/07  
  Mechanical Engineering Lab (electronics) N/R N/R N/R N/R N/R N/R N/R 07/26/07        
  MicroNano (electronics) N/R N/R N/R N/R N/R N/R N/R 05/16/07        
  Nuclear Engineering Lab (electronics) N/R N/R N/R N/R N/R N/R N/R Note 5 11/29/06      
  Superconductivity (electronics) N/R N/R N/R N/R N/R 06/01/06 08/28/06 08/30/06 09/01/06 10/30/06 09/25/06 11/10/06
  Transportation (electronics/CER upgrade) N/R N/R N/R N/R N/R 06/01/06 06/12/06 06/14/06 06/12/06 07/03/06 08/18/06 08/18/06
FAA
  Harding Band Building 06/30/06 07/07/06 10/15/05 07/14/06 12/12/06 07/14/06 08/18/06 08/23/06 02/22/07 03/27/07 12/12/06 05/29/07
  Smith Memorial Hall 02/05/07 06/05/07 02/05/07 08/03/07                
  Flagg Hall 05/03/07   N/R N/R                
  Noble Hall 05/03/07   N/R N/R                
  Art Annex East I 07/21/06 05/03/07 N/R N/R     06/19/07 06/20/07        
  Art Annex East II 07/21/06                      
LAS
  Chemistry Annex (electronics) N/R N/R N/R N/R N/R 06/01/07 06/26/07 07/31/07        
  1202 W Green - Atmospheric Sciences                        
  Environmental Research Annex                        
  1205 W Nevada - Intensive English Institute 12/14/06           07/10/07          
  International Studies Building 07/28/06 10/17/06 08/02/06 08/02/06   08/02/06 05/04/07 05/15/07        
Library
  Grainger Engineering Library 02/08/07 03/09/07 N/R N/R                
Provost
  1208 W Springfield - University High School 01/23/06 08/08/06 01/09/07 03/07/07 07/31/07 09/18/06 02/22/07 03/14/07 05/02/07 05/24/07 07/09/07  
  1210 W Springfield - University High School 01/23/06 08/08/06 10/20/06 11/28/06 03/12/07 09/18/06 11/27/06 12/04/06 12/12/06 05/16/07 03/12/07 06/08/07
  Campus Honors 04/30/07 05/04/07 04/30/07 04/30/07   05/05/07 05/16/07 05/18/07     08/14/07  
  901 W Oregon CITES ICS 03/27/07   03/27/07                  
  Computer Applications Building 05/20/06 06/05/06 06/05/06 06/05/06   07/01/06 11/30-06 01/12/07     07/26/07  
  Oil Chemists Building 06/22/07 06/29/07 06/29/07     06/29/07 07/26/07 07/27/07        
University Administration
  Personnel Services 08/02/06 08/18/06 08/02/06 08/03/06 05/15/07 08/03/06 11/30/06 12/05/06 05/08/07 06/05/07 05/15/07  
  University Press Oak Street 08/11/06 11/30/06 09/18/06 12/22/06 05/08/07 11/20/06 12/22/06 12/28/06 05/08/07 05/29/07 04/30/07 06/25/07
  Harker Hall 10/09/06   01/30/07                  
Vice Chancellor Research
  Observatory 07/01/06 08/09/06 12/18/07 12/18/07   07/10/06 01/15/07 01/26/07     08/06/07  
  Waste Management and Research Laboratory 12/04/06 12/05/06 N/A N/A N/A 12/04/06 02/02/07 03/08/07     08/14/07  
  State Water Survey                        
  909 W Oregon - Music Annex 02/05/07   02/05/07                  
Vice Chancellor Student Affairs
  708 S Matthews Minority Student Affairs 02/22/07 03/06/07 02/22/07 N/R   03/07/07 05/08/07 05/09/07 05/02/07      
  1203 W Nevada - Las Casa 02/22/07 03/02/07 02/20/07 N/R   03/08/07 04/25/07 04/27/07 05/02/07   07/09/07  
2008 Campus Network Upgrade Building Status
  Building Drawings Issued Drawings Returned CER Space Identified CER Space Approved CER Construction Started CITES Plant Engineering Started CITES Plant Engineering Completed Drawings to F&S Electronics Order to Purchasing Electronics Received Construction Start Construction Complete
ACES
  Turner Hall Greenhouses                        
  Ag. Services Building 1917 S Wright                        
  Agronomy Lab South                        
  Agronomy Seed House - 2102 S Wright                        
  USDA Soil Physics                        
  Plant Pathology                        
  Plant Clinic                        
  Soybean Research                        
  Stock Pavilion 10/04/06 10/31/06 10/15/06 11/14/06   01/04/07 06/15/07 06/19/07        
Chancellor
  Willard Airport Caretaker's House                        
  Willard Quonset #3                        
  Public Safety/Parking                        
Engineering
  Material Sciences (Old Kiln) Lab (Electronics)                        
  Aeronautical Lab A (Electronics)                        
  Engineering Senior Design Lab                        
  Optical Physics & Engineering                        
  Chemical Oxygen Iodine Lab                        
FAA
  1001 W Nevada - Dept. of Theater                        
  Building Research Council                        
  Building Research Council Lab                        
  Sculpture Building                        
  Art Studio - Griffith Drive                        
  Glass Sculpture Building                        
  Temple Buell Architecture Building                        
  907 1/2 W Nevada - Dance                        
  Ceramics Facility Griffith Drive                        
  Art & Design Industrial Design Lab                        
  General Arts Building - Griffith Drive                        
LAS
  Shelford Vivarium                        
  Burrill Hall                        
  1204 W Nevada - Indian Studies                        
  1201 W Nevada - African American Studies                        
  1003 W Nevada - Asian American Studies                        
  805 W Pennslyvania                        
  Merriam Lab                        
  912 S 5th - LAS General                        
  510 E Chalmers - Hispanic/Asian Studies                        
  57 E Armory - Slavic Resources                        
  911 S. 6th Women Studies                        
Library/University Administration
  Horticulture Field Lab                        
VC Student Affairs
  Kenny Gym/Annex                        


  Notes:
  1.   The buildings in this table correspond exactly to the first year spreadsheet distributed to the Academic Network Advisory Group. Buildings are grouped by College and listed within that grouping in the priority order of that College.

  2.   N/R indicates that CER construction is nor required. Either existing CER is sufficient for the purpose or the upgrade is electronics only.

  3.   N/A Indicates not applicable.

  4.   All construction to be performed by F&S unless otherwise indicated in supplemental bid status table.

  5.   Minor infrastructure improvements ordered - additional AC power &or SMF installed.

  Definition of Terms:
  Drawings   Floor plan drawings for buildings issued for purposes of identifying CER space and locating the position of CAT 6 jacks by the department network administrators and planners.

  CER   Communications Equipment Room

  CER Construction   The building of the physical room walls for the CER, including installation of AC power and air conditioning.Typically, this is the same as construction start, however, in certain instances, CER construction may start earlier.

  CITES Plant Engineering   Design of racks, horizontal and vertical pathways, conduits, raceways and fiber optic connections. CITES plant engineers are certified as Registered Communications Distribution Designers (RCDD) by BICSI (Building Industry Communications Standards International).

  Drawings to F&S   All work is assumed to be performed by F&S trades except for those projects which exceed the bid limits. The date at which drawings are delivered to F&S is followed by program data statement (PDS) development and job authorization by CITES, after which construction work orders are created.

  Electronics   Network gear such as switches, routers and power panels.

  Electronics Received   Network gear substantially received. In general, sufficient electronics have been received to install and "turn up" the building.

  Construction Complete   CERs under access control, electronics installed and building network operating.


CITES welcomes comments about our services and comments about our web site.
Return to the top of this page.
Last modified August 15, 2007